Quantcast
Channel: Tribune Star: Public Notices
Viewing all articles
Browse latest Browse all 1614

IN COMPLIANCE WITH 327 IAC 15-...

$
0
0
In compliance with 327 IAC 15-5 (Rule 5), notice is hereby given that construction of a parking lot located at 200 Spruce Street in Terre Haute, Harrison Township, Vigo County, Indiana is scheduled to commence March 2016 and construction should be completed by March 2021. Run-off from the project site will be routed into new infiltration trenches on site. Storm water will leave the site by entering the groundwater via infiltration. Final receiving waters will be the Wabash River. Questions or comments should be directed to: Developer: Bryan Duncan Indiana State University 951 Sycamore Street Terre Haute, IN 47804 Phone: (812) 237-8100 Engineer: Dave Myers Myers Engineering, Inc. 525 West Honey Creek Drive Terre Haute, IN 47802 Phone: (812) 238-9731 152708 TS 2/3/16 hspaxlp

Viewing all articles
Browse latest Browse all 1614

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>